The Takeoff The estimate
Ask Whether an Earlier Roof Start Carries a Rush Fee
An earlier roof start can add a rush charge, a delivery line or a crew premium, so ask where each one sits in the written estimate.
A roofer who can start on the day you want is often asking you to pay for the calendar. Crews, material pickups and dumpster slots in the St. Louis area are booked weeks ahead, and when a homeowner asks to move the start up, the office has to rearrange something else to make room. Some roofers absorb that cost. Others write it into the estimate as a rush fee, a schedule premium or a line that reads like a material charge. You should know which one you are looking at before you sign.
Cost and estimates
An estimate is only as firm as its line items. A start date is not a line item, but the price of moving it can be. If you ask a roofer to start in three weeks rather than seven, the change may affect labor scheduling, the number of crew days, the delivery window for shingles and the choice of which crew takes your job. Any of those can push the number up. The roofer has to decide whether to carry that cost, pass it through or hold your original price for the earlier date.
Ask the question in writing. Send the office one sentence: "Does the earlier start date in this estimate carry any charge beyond the quoted price?" The reply will tell you more than a verbal assurance on the phone. If the answer is no, ask for that in the estimate itself. If the answer is yes, ask for the amount, the reason and whether it is a flat sum or a percentage of the job.
What it costs
Rush charges usually show up in one of a few forms. Some are a flat sum added to the total. Some are a higher unit price for the labor portion, applied to the whole job. Some appear as a separate line for expedited material delivery, which can be real, because a supplier may charge to truck shingles to a St. Louis address on short notice. Others are harder to see. A crew with fewer open days on the schedule may be charged to a job that should have been quoted at a normal pace.
Compare what each form means for your total. A flat fee of a few hundred dollars is easy to identify and easy to weigh against an earlier finish. A labor premium spread across the price is harder to see, and it changes if the job runs long. A delivery charge may be reasonable, but only if the roofer shows you the supplier invoice or a clear rate. Ask which form applies, and ask whether the square count and materials stay the same at the earlier date.
If the estimate names an Atlas or Malarkey shingle, ask whether the earlier date depends on stock already at the supplier. A product that has to be ordered for a new date can carry a different delivery charge than one already waiting on a pallet. A change of product to hit a date is a different question from a change in price, and both need to be written down before you agree to either.
Timing has a cost in St. Louis that is not always in the estimate. An earlier start in late spring means the crew works through the rainy season and the afternoon heat. An earlier start in late fall means an open roof faces the first hard freeze sooner. Neither is a reason to refuse an earlier date, but both are reasons to ask what the roofer will do with the deck if the weather turns on day two. That answer belongs in the written scope, not in a phone call.
What to ask
Before you ask for an earlier date, ask for the rules. These questions separate a clear answer from a vague one:
- Is there a rush or expedite charge on this estimate, and is it listed as its own line?
- If I accept the earlier date, does the total change, and by how much?
- Does the earlier date change the shingle product, the underlayment or the fastener count?
- Which supplier will deliver, and is any delivery charge a fixed sum or a rate?
- If the earlier date slips because of weather, does the rush fee come back, stay on the job, or move to the next date?
- Who will be on the roof, and is it the same crew quoted for the normal date?
The last two questions matter most. A rush fee is often charged on the promise of a date. If the date slips because the roof had to wait for a dry morning, the homeowner may be paying for a schedule the roofer did not keep. Ask that the terms for a weather delay be stated next to the rush charge, not in a separate document you may never see. The same goes for a change of crew. A quote written for one crew and billed at a faster pace should say which crew is doing the work.
Compare the earlier date with the cost of waiting
Earlier is not always cheaper, and later is not always free. Before you accept a rush charge, add up what you save by finishing sooner. If the roof is leaking now and the ceiling stain is spreading, the earlier date may be worth more than the fee. If the leak is under control and the only reason to hurry is preference, the fee may not be worth paying. Write down the date you need and the reason for it. A roofer who cannot tell you in writing what an earlier start will change has not priced it yet.
If you want to go through the options before you sign, call the Keys office at (314) 220-2333 and ask for the rush terms in writing. Ask for the date you want, the date they can hold and the charge for moving between the two. Then compare the written answers the way you would compare two unit prices, line by line.
Bring the quote you were handed
Send us the quote you already have and we will measure against it
Keys will measure your roof and produce the same document properly: square count, measured pitch, expected layers, decking unit rate, the assembly from the deck up and the penetration list. Put the two side by side. Where they disagree on a quantity, one of them has not been on your roof, and you will be able to see which.
If you would rather talk it through, this is the office line and not a call centre.
(314) 220-2333Keys Roofing, greater St. Louis