A Contingency Line Is Not a Discount: Ask What Draws It Down
A contingency line is money held back for hidden damage, so ask what triggers it, who approves it, and what happens to any part you never spend.
A roof estimate often has a line that says contingency, or hidden damage allowance, with a dollar figure beside it. That figure is money set aside for things nobody can see until the old roofing comes off, such as soft decking, a rotted rake board or a flashing that was never properly sealed. It is not a discount, and it is not a price for work you have already agreed to. Before you compare totals, you need to know what the figure is for, who can draw it down, and what happens to the part you never spend.
Why a contingency line exists on a St. Louis roof
Roofs in this metro age in a particular way. Freeze and thaw cycles through a St. Louis winter push water into every small gap, and the wood under a shingle stays wet longer than the shingle above it. A deck that looked sound from the ladder can show soft spots once the tear-off exposes it. Hail season adds another layer, because a storm that dented the surface may also have loosened nails or lifted edge metal that the roofer will want to replace. A contractor who quotes a fixed number with no allowance for those discoveries is either guessing low or planning to bill you later for work you did not know about. A contingency line is the more honest way to plan for that.
Three questions that turn a vague line into a number you can check
- What triggers a draw? The estimate should name the conditions, for example a deck panel that fails when the crew tests it with a pry bar, or a rafter tail that cannot hold a fastener. A vague phrase like unforeseen conditions, with no description attached, is too loose to plan around.
- Who approves each draw before the work happens? Ask whether the crew will stop, photograph the damage and send you a written change with the unit price before it cuts or replaces anything. If the answer is that the crew will proceed and invoice later, the line is open-ended.
- What happens to the unused balance? If the line is a set amount and the crew uses only part of it, the rest should come off the final bill. Ask for that sentence in writing. Some quotes are silent on it.
A worked example
Suppose a quote has a base price for the tear-off and install, plus a contingency line for hidden decking and edge boards. The tear-off reveals a section of soft decking near a valley and two rake boards that will not hold nails. The crew measures the decking, photographs it and sends you a short written change with the area and the rate agreed in the contract. You approve it before anything is cut. The rake boards are priced by the foot, so the change shows the footage as well. When the job closes, the final invoice shows the base price, the draws you approved and a credit for whatever part of the contingency went unused. You can check each line against the photos and the rates in the original scope. If the crew had replaced the boards without asking, you would have no way to judge whether the rate was fair.
What a draw should look like on paper
When damage turns up mid-job, the record should show what was found, where it is, how large the area is and what it costs at a rate already set in the contract. Keys documents damage with photos and measurements and puts a written scope in the homeowner's hands, so you have the same evidence the crew used to decide. That applies whether the find is a few square feet of decking or one rake board. Keep the photos with your estimate, and compare them against the final bill line by line, so each draw has a matching picture.
Where the line sits in the estimate
Look at where the contingency appears. If it is buried inside the labor total, you cannot see how much of your payment is held for unknowns. If it sits on its own line with its own figure, you can compare two quotes on equal terms. One roofer may carry a larger contingency with a lower base price, and the totals may look different while the cost of a real surprise stays about the same. Put the two quotes side by side, then ask each roofer for the contingency figure separately.
What to ask before you sign
- Is the contingency a fixed cap, or an estimate that can grow?
- What is the rate for each common find, such as a square foot of decking or a linear foot of fascia?
- Will the crew stop and get my written approval before any draw?
- When the job closes, will the unused balance be credited on the final invoice?
- Which shingle line is named in the quote? Keys installs Atlas and Malarkey shingles, and the quote should name the exact product.
- Does the contingency cover only the deck and edge boards, or anything else the crew might find?
What the line does not cover
A contingency line is for hidden conditions under the roof. It is not a place to hold work you have not priced, such as gutters you may want later, a skylight you might replace, or a ridge vent you only decide on after the quote. If you add those items mid-job, they should be written as separate change orders with their own prices. Mixing them into the contingency makes it impossible to tell what the roof itself cost.
If you want the contingency terms explained before you decide, Keys Roofing can be reached at (314) 220-2333. Ask for the written scope and the photo plan at the same time, so the number and the evidence arrive together.
Bring the quote you were handed
Send us the quote you already have and we will measure against it
Keys will measure your roof and produce the same document properly: square count, measured pitch, expected layers, decking unit rate, the assembly from the deck up and the penetration list. Put the two side by side. Where they disagree on a quantity, one of them has not been on your roof, and you will be able to see which.